If the City of Hillsboro has asked you for a performance guarantee before you can pull your site development permit or start work in the right of way, you are in the right place. You likely have a project ready to move, an engineer's estimate in hand, and a permit reviewer waiting on one last item. That item is the bond, and it need not slow you down.

 

We have been writing surety bonds since 1971, and we handle Hillsboro site development and right-of-way permit bonds all the time. Tell us what the City is asking for and we will match you with the right guarantee, quote it quickly, and get the paperwork in your hands so you keep your schedule. If you would rather just get moving, you can request a quote or call us at 800-333-7800 and talk to a real person.

 

What a Hillsboro Site Development Bond Actually Is

A site development bond is a promise, backed by a surety company, that you will finish the public improvements tied to your project the way the City approved them. It is a three-party arrangement: you are the principal doing the work, the City of Hillsboro is the obligee being protected, and we arrange the surety that stands behind it financially.

 

Here is the plain-English version. When your project affects public infrastructure, such as streets, sidewalks, curbs, storm drainage, or utilities in the right of way, the City wants assurance the work gets completed and public property gets restored. Rather than hold your cash, the City accepts a bond. If the work is never finished or the site is left in bad shape, the City can make a claim, and the surety steps in so taxpayers are not stuck with the bill. Most contractors finish, close out the permit, and never think about the bond again.

 

This is closely related to a site improvement bond and to the broader family of right of way and encroachment bonds that cities use across the country. Hillsboro applies its own permit process and Design and Construction Standards to the same idea.

 

Why the City of Hillsboro Requires One

Hillsboro reviews development through its Permitting Center, and two permit types tend to trigger a bond. A site development permit covers utility installations, grading and erosion control, stormwater management, and traffic control on your project site. A right-of-way permit covers work performed in the public right of way, whether you are a homeowner, a business owner, or a commercial contractor. When your permit includes public improvements, the City wants a financial guarantee behind them before it signs off.

 

You can see the City's own overview on its Site Development and Right-of-Way Permits page, and the engineering requirements live in the City's Design and Construction Standards. Those standards spell out how the improvements must be built, which shapes what your bond is guaranteeing.

 

Hillsboro sits in Washington County, so depending on your scope you may run into related requirements. If your work touches county utilities, for example, you might also need a Washington County utility installation permit bond. We can help you sort out which bonds your project calls for.

 

How Much Does the Bond Cost, and How Is the Amount Set?

Two different numbers matter here, and people often mix them up.

 

The first number is the bond amount, sometimes called the penal sum. This is the coverage the City requires, and it is set by the City, not by us. Hillsboro generally ties the amount to the engineer's estimate of the cost of the public improvements, commonly expressed as a percentage of that estimate. Because it is based on your specific scope, the bond amount is variable, so a small right-of-way job and a full site development project will not carry the same number.

 

The second number is your premium, which is what you pay us to issue the bond. It is a small percentage of the bond amount, typically paid as an annual figure, and your rate depends on the bond size and a quick look at your financials or credit. Once we see your numbers, we will give you a firm quote with no surprises. A quick tip: finalize your engineer's estimate first, since it anchors both the bond amount and your premium.

 

What the Performance Guarantee Secures

Hillsboro does not publish a standalone, fill-in-the-blank bond form for this. The guarantee is issued with your permit, and the wording follows the City's requirements and its Design and Construction Standards. Here is what the performance guarantee is really promising on your behalf:

  • Completion of the public improvements. The streets, sidewalks, curbs, drainage, utilities, or other infrastructure in your approved plans get built.
  • Work that meets Hillsboro's Design and Construction Standards. The improvements are finished correctly and pass inspection.
  • Restoration of the right of way and public property. Anything disturbed during construction is put back in acceptable condition.
  • Protection for the City if the work is abandoned. If a project stalls and the obligations are not met, the City has a financial remedy through the bond.

Some projects also involve a separate maintenance or warranty period after the improvements are accepted. If your permit calls for that, we can arrange the corresponding guarantee too. Just tell us what the City handed you and we will match the bond to it.

 

Getting Your Bond Without the Headache

The process is straightforward. You send us the bond amount the City is requiring and your engineer's estimate, along with a short application. We review it, quote your premium, and issue the bond. You then file it with the City and move ahead. We handle Oregon surety bonds of every size for contractors, developers, and property owners, whether this is your first permit bond or your fiftieth.

 

Frequently Asked Questions

Who needs a Hillsboro site development or right-of-way bond?

Generally, anyone whose Hillsboro permit includes public improvements. That covers commercial contractors, developers, and sometimes business or property owners doing work in the public right of way. If the City's permit conditions list a performance guarantee, you need one.

How is the bond amount decided?

The City of Hillsboro sets it, usually as a percentage of the engineer's estimate of the cost of the public improvements. Because it tracks your specific scope, the amount is different for every project. We do not set this number, the City does.

Is there a standard bond form to download?

No. Hillsboro issues the guarantee through the permit itself rather than publishing a standalone form. That is normal for this kind of bond. We handle the correct wording based on the City's requirements so you do not have to chase down a template.

How fast can I get the bond?

Often the same day for smaller bonds with a simple application. Larger bonds may need a bit more review, but we move quickly. Having your engineer's estimate and bond amount ready is the best way to speed things up.

What happens if I do not finish the work?

If the obligations are not met, the City can file a claim against the bond, and the surety responds so the public is protected. You remain responsible to the surety for any covered loss, which is why finishing the work as approved is always the goal.

 

Ready to Move Forward on Your Hillsboro Bond?

You have a permit to pull and a project to build, so let us take the bond off your plate. Send us your bond amount and engineer's estimate and we will quote it, issue it, and get you back to work. Call Surety Bond Authority at 800-333-7800 or contact us here. We have been doing this since 1971, and we would be glad to help.